• Document: Western Power Safe Work Method Statement Task details
  • Size: 315.76 KB
  • Uploaded: 2018-12-08 21:01:58
  • Status: Successfully converted


Some snippets from your converted document:

Western Power Safe Work Method Statement Task details Description Install and Maintain Underground Equipment DM 10717904 Approved by Manager, Work Practices Review team SWMS Development Approval date October 2015 Qualifications/Licences required Valid Western Power Authorisations for the Task/ Network Authority Card (Correct level of authorisation) Permits required Electrical Access Permit (EAP) or Vicinity Authority (VA) for excavation near live cables. (Work in Vicinity request required for external and contractors) Which Safety LifeSavers are required for this task? Potential hazards associated with the task Category Hazard Category Hazard Category Hazard  Ladders  Competitive pressures  Asbestos  Lifting equipment, scissors / EWP  Compressed gases / air  Confined space / void space  Scaffolding  Fluid  Falling objects 1. Working at heights  Stairs / platforms 5. Pressure  High pressure steam  General access  Working at height  Hydraulic  Housekeeping  Working above others  Water  Illumination / lighting  Multiple work requiring EWPs  Noise, i.e exposure / nuisance  Static electricity / induction  Rushing  Poor ventilation  Substations / switch rooms  Complacency  Protrusions Underground cables  Fatigue  Restricted visibility 10. Workplace  Restricted work area  Contact with electrical equipment  Unclear work direction 2. Working with electricity 6. Human factors  Slip and trip hazards  Electrical cables  Stress / Anxiety / Frustration  High voltage equipment  Lack of knowledge  Unauthorised personnel  Overhead cables  Poor communications  Unlabelled controls  Non-compliant earths (tagged/tested)  Negative attitudes  Vibration  Infra-red  Traffic / pedestrian interaction / collision  Wet / slippery  Microwaves  Uneven terrain  Wind / storm activity 3. Radiation  Ultraviolet light, i.e. sun 7. Using mobile plant  Unlicensed / untrained operators  Fog / mist / smoke  X-ray

Recently converted files (publicly available):