• Document: Safe Work Method Statements (SWMS) Field Operations
  • Size: 5.89 MB
  • Uploaded: 2018-12-08 22:01:24
  • Status: Successfully converted


Some snippets from your converted document:

Safe Work Method Statements (SWMS) Field Operations CS10 # 2089655 Uncontrolled when printed Table of Contents Cable Pitch Removal Cable Spiking Chainsaw Operation – Tree Pruning / Pole Cutting Change Service Protection Device (De-Energised) Energised Equipment Access Excavation / Trenching and Horizontal Directional Drilling Hendrix Spacer Cable House Services and Metering Install and Maintain HV Overhead Equipment and Associated Hardware (De-energised) Install and Maintain HV Overhead Equipment and Associated Hardware (Energised) Install and Maintain Poles (Energised) Install and Maintain Poles and Stays (De-energised) Install LV Spreaders (Energised) Installation of Reinforcing Irons on Wooden Poles Install Pad Mount Transformer / Ring Main Unit (RMU) Install Silver Spring Network (SSN) Device Access Point and Relays on Distribution Poles Insulator Washing and Siliconing Jointing Overhead Conductors – HV or LV (De-energised) Jointing Overhead Conductors – HV or LV (De-energised) Operate Mobile Plant and Equipment – EWP, Auger, Borer Overhead Fault or Damage (HV or LV) Oversize Load Vehicle Movement Perform Overhead Switching Operations (HV) Perform Overhead Switching Operations (LV) CS10 # 2089655 Uncontrolled when printed Perform Underground Switching Operations Replace Overhead Consumer Service Core at SWER Line Transformer Restricted Access Vehicle Escort Service (RAV) – Horizon Power Escort Streetlight Fault / Damage (car vs pole) Substation Inspection Substation Maintenance Wood Pole Inspection Process Working in a Confined Space CS10 # 2089655 Uncontrolled when printed SWMS Field Operations Documents CS10 # Rev # Rev Date Cable Pitch Removal 2358416 0 November 2013 Cable Spiking 2358315 0 September 2013 Chainsaw Operation – Tree Pruning/Pole Cutting 2358899 0 November 2013 Change of Service Protection Device (Energised) 2358217 0 April 2014 Energised Equipment Access 2075076 0 November 2013 Excavation / Trenching and Horizontal Directional Drilling 2359302 0 November 2013 Hendrix Spacer Cable 2358699 0 November 2013 House Services and Metering 2077536 0 November 2013 Install and Maintain HV Overhead Equipment and Associated Hardware (De-energised) 2358826 0 November 2013 Install and Maintain HV Overhead Equipment and Associated Hardware (Energised) 2358998 0 November 2013 Install and Maintain Poles (Energised) 2359476 0 September 2013 Install and Maintain Poles and Stays (De-energised) 2359177 0 November 2013 Install LV Spreaders (Energised) 2359388 0 November 2013 Installation of Reinforcing Irons on Wooden Poles 2358827 0 September 2013 Install Pad Mount Transformer – Ring Main Unit 2077880 0 November 2013 Install Silver spring Network (SSN) Device Access Point and Relays on Distribution Poles 2165289 0 September 2013 Insulator Washing and Siliconing 2358700 0 September 2013 Jointing Overhead Conductors – HV or LV (De-energised) 2078261 0 September 2013 Jointing Overhead Conductors – HV or LV (Energised) 2078450 0 September 2013 Operate Mobile Plant and Equipment – EWP, Auger, Borer 2075309 0 September 2013 Overhead Fault or Damage – HV or LV 2078572 0 September 2013 Oversize Vehicle Escorts 2084695 0 September 2013 Perform Overhead Switching Operations – HV 2079421 0 September 2013 Perform Overhead Switching Operations – LV 2080019 0 September 2013 Perf

Recently converted files (publicly available):